photo Italy_zpsvc6cvfx0.png Ebates Coupons and Cash Back
Showing posts with label new construction. Show all posts
Showing posts with label new construction. Show all posts

Thursday, December 7, 2017

New Man Cave Construction Update - December 2017

We're getting there. It's been a few months since I provided the last update so here we go. We are DIY'ing this project as funds provide so this is slow going but we are seeing the light at the end of the tunnel.

We've begun to put the siding on, purchased from Lowe's (8.25" x 12" wood grain hardiboard) just this past week. This is cemented that has been primed and is not supposed to rot. We will paint the siding once it's in place and we decide on a color. We also added the short overhang on the front of the building and bought composite shingles to match the house. These are Tamko shingles in Weatherwood.

The highlight is the cedar shakers and the functioning window just above the overhang. For cost purposes we decided to only put the shakers on the front of the man cave and not the back. We also purchased the shakers from Lowe's, they were about $20.00 a bundle. We originally figured on 6 bundles but had to go back and get 5 more!






























This is where we stand on December 7th, 2017. Cold, windy weather is moving in, we're getting our first hard freeze of the season. We will get back after this when weather allows.

Sunday, September 17, 2017

Update on the New Man Cave as of September 17, 2017

We now have a composite shingle roof, roof trim, four windows and a steel side door. With the addition of two overhead doors, we will then be in the dry. It's all slow but sure when you DIY it and you have a regular 9-5 too.









Sunday, June 11, 2017

New Man Cave Construction Project - Doing it Ourselves

Hubby and I are weekend DIY'ers. We choose to DIY on everything we can to save money. Hubby has the talent, plus he needs something to do. Here are our first efforts at our new man cave.

We finally settled on a 40 x 40 slab. The Cave will be 30 ft across and 40 ft deep.  Cave runs East/West. There will be a 10 ft overhang on the north side.

For informational purposes, the total cost of  the concrete in Oklahoma for this project was $12,600.00. This includes the 40 x 40 slab and 920 sf of flat work which is the approach that was poured connecting our driveway to the man cave slab.



First section of back wall - East side of cave

Full wall complete

Making some progress

One window, east wall

Got two more windows and a door In - Hubby praying for a break

An example of how the 2 x 4's are attached to the concrete.
Notice we have plumbing as well!
Up With the Trusses and Braced. It took 5 good men on a
Memorial Day about 4 hours to complete adding the trusses.


Makings of a bathroom














Latest Completion June 11, 2017, OSB going up!




















Weekend of 06/17/2017, got the top ends enclosed. Next week will work on decking the roof: